|
The first flood peak of Huaihe River passed through the last hydrographic station of Anhui section at 4 p.m., July 17. Anhui Flood prevention and drought relief headquarter thus announced that 129 dangerous flood situations were under effective control when the flood peak passed through. Anhui’s flood control of Huaihe River was currently achieved. (Wang Jing)
|